Welcome to EXCITECH

Machine Maintenance of six-sided drill in Holidays

System backup, CAM backup, completes the controller software, compressed package into a USB flash drive or computer.

  1. Clean up the dust and impurities on the machine table, table top, drag chain, lead screw, rack and guide rail with gas, then brush the rack and guide rail with lubricating oil (machine tool guide rail oil ISO VG-32~68 is used, and butter is prohibited) to ensure that there is oil on the guide rail and rack of each shaft, and drain the water in the oil-water separator in the bed.
  2. Clean the impurities on the surface of the drilling package with gas. The gear box of numerical control drilling rig needs to be filled with lubricating oil from the oil filler: 5cm, Krupp L32N lubricating oil.
  3. Cut off the power supply of the distribution box, and clean up the dust in the distribution box by vacuuming (note: do not blow directly with gas, raising dust

will lead to poor contact of electronic components). After cleaning, put desiccant in the cabinet.

Preparation before the holiday

Equipment cover

The equipment is well maintained. If possible, it can be covered with plastic bags (machine tool gowns) to prevent dust falling.

vacuum pump Baker and EXCITECH dry pump users should clean the dust in the filter element of the vacuum pump before the holiday, and add 20g Amblygon TA15/2 grease as lubricating oil.

vacuum cleaner Clean the dust and impurities at the suction port, and clean the sawdust in the cloth bag.Instructions before leaving the factory Before leaving the factory, customers should turn off the main power/air inlet switch of all electrical equipment to avoid unattended operation and unnecessary troubles during holidays.

Note: The above maintenance contents and matters are applicable to Excitech CNC brand equipment.

Send your message to us:

INQUIRY NOW
  • * CAPTCHA: Please select the Truck


Post time: Jan-16-2023
WhatsApp Online Chat !